Russian version English version Deutsche version
Main page Search Contact Us
Department of investments and project support of the Krasnodar region
Today: May 18, 2012
Feedback Form
 

Contact us:

35, Krasnaya st.,
Krasnodar, Russia
350014

fax +7 861 262 36 81
e-mail dips@krasnodar.ru

For foreign investors, please, contact:

Natalia Bespalaya
+7 (861) 268-48-78

Exchange rates
USD ($) 30,94
Euro () 39,39

Building of complex with roadside service

Basic information about ground area
The planned use of landBuilding of complex with roadside service
Location of the projectSeverskiy district
Address of the locationKrasnodarskiy region Severskiy district, , Ilskaya settlement FAR 59 km+700m (to right) ”
Cadastral number of quarterNo
Area of the declared (ì2)7000
Category of the earthsThe grounds of settlement
Kind of permitted useNo definite
Actual useband of the estranging auto road
Availability of buildings, structures, constructionsNo
Authorizations, urban planning documentationSchemes town building planning the territory general plan populated points of Severskiy region is approved by Decision of the Advice MU Severskiy region from March 16 2006 ¹ 252
Information about the proprietor (legal owner) of the ground area
ProprietorState property
Legal owneradministration of the municipal formation Severskiy region, 69, Lenin st., Severskaya settlement, Severskiy region
Kind of rightsOperational manager
Information about burden
Kind of burden, restrictionsAre not registered
Area of burdenNo
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply To build a new electroline 110/35/10 Wl -10 kW. Instolation KTP 630/10/0,430
Gas supply from nearest gas line , o of pipe line 219 mm, meddle power pressure50
Water supply require a new artezianian borehole, consumption-.200 cub.m. per day. 
Water drain Require to build a new KNS power-1000ì.3per day, o-pipe line 400 
Installation of telephones  1000
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.)3.8
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Severskaya town16
Center of the subject of federation Krasnodar city53
Highways (regional, federal value) Federal auto road Êrasnodar-Novorossiysk0,02
Highways of local value  0,02
The nearest railway station “Ilskaya” station5.5
Nearest tracks  2.2
Airport “Krassnodar”63
Seaport “Nonorossiysk”90
The additional information about ground area
Special conditionslevel of subsoil waters of 1,0-1,5 m, a dominating direction of winds – east, seismistic of 8 points, frozen of ground -0.69m; The site relief flat, is not flooded with freshet waters, mushiness is not present.
Cost of rent/repayment of ground area (million rubles)The sum of the rent -0,2 mln.rbl/ the sum of the ransom –2.2 mln .rbl.
NotesNumber of the population Severskiy region -110,7 thous. person. Population size of Ilskiy settlement -23 thous. people