| Basic information about ground area |
|---|
| The planned use of land | Building of complex with roadside service |
| Location of the project | Severskiy district |
| Address of the location | Krasnodarskiy region Severskiy district, , Ilskaya settlement FAR 59 km+700m (to right) ” |
| Cadastral number of quarter | No |
| Area of the declared (ì2) | 7000 |
| Category of the earths | The grounds of settlement |
| Kind of permitted use | No definite |
| Actual use | band of the estranging auto road |
| Availability of buildings, structures, constructions | No |
| Authorizations, urban planning documentation | Schemes town building planning the territory general plan populated points of Severskiy region is approved by Decision of the Advice MU Severskiy region from March 16 2006 ¹ 252 |
| Information about the proprietor (legal owner) of the ground area |
|---|
| Proprietor | State property |
| Legal owner | administration of the municipal formation Severskiy region, 69, Lenin st., Severskaya settlement, Severskiy region |
| Kind of rights | Operational manager |
| Information about burden |
|---|
| Kind of burden, restrictions | Are not registered |
| Area of burden | No |
| The characteristic of existing engineering infrastructure |
|---|
| Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
|---|
| Electrical supply | To build a new electroline 110/35/10 Wl -10 kW. Instolation KTP 630/10/0,4 | 30 |
| Gas supply | from nearest gas line , o of pipe line 219 mm, meddle power pressure | 50 |
| Water supply | require a new artezianian borehole, consumption-.200 cub.m. per day. | |
| Water drain | Require to build a new KNS power-1000ì.3per day, o-pipe line 400 | |
| Installation of telephones | | 1000 |
| Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) | 3.8 |
| Distance till large settlements and objects of transport infrastructure |
|---|
| Remoteness from | The name | Distance (km) |
|---|
| Center of municipal union | Severskaya town | 16 |
| Center of the subject of federation | Krasnodar city | 53 |
| Highways (regional, federal value) | Federal auto road Êrasnodar-Novorossiysk | 0,02 |
| Highways of local value | | 0,02 |
| The nearest railway station | “Ilskaya” station | 5.5 |
| Nearest tracks | | 2.2 |
| Airport | “Krassnodar” | 63 |
| Seaport | “Nonorossiysk” | 90 |
| The additional information about ground area |
|---|
| Special conditions | level of subsoil waters of 1,0-1,5 m, a dominating direction of winds – east, seismistic of 8 points, frozen of ground -0.69m; The site relief flat, is not flooded with freshet waters, mushiness is not present. |
| Cost of rent/repayment of ground area (million rubles) | The sum of the rent -0,2 mln.rbl/ the sum of the ransom –2.2 mln .rbl. |
| Notes | Number of the population Severskiy region -110,7 thous. person. Population size of Ilskiy settlement -23 thous. people |