| Basic information about ground area |
|---|
| The planned use of land | Shopping pavilion construction |
| Location of the project | Gelendgik city |
| Address of the location | Lesnoy avenue, Dzhankhot village, Gelendzhik |
| Cadastral number of quarter | 23:40:0509001: |
| Area of the declared (м2) | 533 |
| Category of the earths | Land of localities |
| Kind of permitted use | for building a shopping pavillion |
| Actual use | Not used |
| Availability of buildings, structures, constructions | No real estate objects on the territory |
| Authorizations, urban planning documentation | The general plan of the Municipal formation Gelendzhik resort-city (approval stage) |
| Information about the proprietor (legal owner) of the ground area |
|---|
| Proprietor | State ownership |
| Legal owner | Free from third party |
| Information about burden |
|---|
| Kind of burden, restrictions | None |
| The characteristic of existing engineering infrastructure |
|---|
| Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
|---|
| Electrical supply | 15 kilowatt / air line 0,4 kilowatt | 15 |
| Gas supply | Individual gas installation | |
| Water supply | 5 m3 per a day Own source of water supply - a chink | |
| Water drain | 5 m3 per a day. Individual source - a septic tank | |
| Installation of telephones | Telephone line – 5 х 2 х 0,4 | 40 |
| Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) | 0,7 |
| Distance till large settlements and objects of transport infrastructure |
|---|
| Remoteness from | The name | Distance (km) |
|---|
| Center of municipal union | Central Square, Revolutsionnaya street, 1 | 16 |
| Center of the subject of federation | Krasnodar | 190 |
| Highways (regional, federal value) | M-4 Don | 13,5 |
| Highways of local value | Lesnoy avenue | 0,005 |
| The nearest railway station | Novorossiysk | 35 |
| Nearest tracks | Novorossiysk | 35 |
| Airport | Gelendzhik | 24 |
| Seaport | Novorossiysk | 35 |
| The additional information about ground area |
|---|
| Special conditions | Engineering prospecting were not conducted, there is descriptive geology. Seismic – 8 balls. Lay of land is plane. Trees are absent. Wind direction – northeastern and southwestern. |
| Cost of rent/repayment of ground area (million rubles) | 0,018 per year / don’t appraised |