In Russian     In English
 Site map rssrss

Construction of a plant for production of polyethylene pipes

Project nameConstruction of a plant for production of polyethylene pipes
Location of the projectArmavir Сity
Industry classificationManufacturing industry
Basic information about the project
Project essenceThe project involves theconstruction of a modern plant for the production of polyethylene pipes.
Project capacityMON PE 80 water supply 400000 Pogue. m. HDPE PE 80 for gas pipelines 300000 Pogue. m MON PE 100 for water supply 450000 Pogue. m HDPE PE 100 for gas pipelines 336500 Pogue. m
Consumer market descriptionThe main consumers of polyethylene pipes are construction companies, as well as residents of the province, making repairs to their homes.
Object construction term1.50
Competitive advantagePolyethylene pipes have undeniable advantages over metal: -high karrozijnoj resistant to the transported fluids; -low specific weight (three times lower than that of steel); -high mechanical strength (tensile strength of 350 to 800%); -increased throughput (with the same diameter of 20-30% higher than other pipes); -not zaslakovyvautsa and not overgrown with from the inside; -piping can be frozen without it breaking. In addition, polyethylene pipes are highly flexible and reliable connection, which makes them indispensable in seismically active areas and in places where there may be movement of soil.
Resource availability for project realizationThere Is A
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh415.00
Planned volume of gas consumption (annual), million cubic meters0.00
Planned volume of water consumption (annual), million cubic meters0.07
Degree of project developmentDeveloped business plan, formed the plot of land.
Financial estimation of the project
Total cost of the project, mln rubles1000
Own resources, million rubles0.00
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles1000.00
Conditions of investor participationDirect investments
Form of investments returnThe Monetary
Payback period3.90
Basic indicators of investment project economic efficiency
Net present value (NPV)349.01
Simple payback time3
Discounted payback period3.75
Internal rate of return (IRR)70.3
Productivity index (PI)1.2
Income per year 1394.23
Social efficiency of investment project
Number of workplaces127
Salary average level (thousand rub per year)204
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles316.39
which includes into consolidated budget of the krai, million rubles146.18
General information about the ground area
Address of the areaArmavir, Northern industrial area
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23380102003
Declared area (m2)40000.00
Limit size of the area (m2)40000.00
Land categoryLands of inhabited localities
Kind of allowed useProduction
Actual useLand plot is free of any buildings
Availability of buildings, structures, constructionsLand plot is free of any buildings
Permits, town-planning documentation- Land Use and Development Regulations, approved by decision of Armavir City Council "On approval of land use and development of municipal formation town of Armavir," from 29.07.2010, № 70.
Information about proprietor (right holder)
ProprietorPublic property
Right holderAdministration of municipal formation Armavir town
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationThere Are No
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)OAO «nesk-socket Armavirelektroseti ".
Power supply center (electrotension class)Middle class of tension – from 1 kV to 35 kV
Power supply center (free power (MWt))15.00
Power supply center (distance(m))324.00
Nearest connection point (network tension, kV)6.00
Nearest connection point (distance(m))324.00
Gas-supplying
Gas pipeline (name, right-holder)Jsc "Armavirgorgaz"
Gas pipeline (diameter(mm))325.00
Gas pipeline (pressure(MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Gas pipeline (carrying capacity(cube. m.in a year))9734264.00
Gas pipeline (distance(m))323.00
Nearest connection point (diameter(mm))325.00
Nearest connection point (pressure (MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Nearest connection point (carrying capacity (cubic meter a year))9734264.00
Nearest connection point (distance(m))323.00
Water-supply
Water supply source (name, right-holder)GUP KK N WOOK "Kurganinsky group aqueduct
Water supply source (power (cubic meters a day))200.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))61.00
Nearest connection point (power (cubic meters a day))200.00
Nearest connection point (diameter(mm))150.00
Nearest connection point (distance(m))61.00
Sewage system
Type of building (name, right-holder)GUP KK N WOOK "Kurganinsky group aqueduct
Type of building (power (cubic meters a day))200.00
Type of building (distance(m))60.00
Nearest point of connection (power (cubic meters a day))200.00
Nearest point of connection (diameter(mm))1200.00
Nearest point of connection (distance(m))60.00
Installation of telephones/internet
Central network (distance(m))0.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub63.80
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation The central part of the town of Armavir4.00
nearest settlement The Town Of Novokubansk16.00
Center of federal subject Krasnodar city250.00
highways (regional, federal value) MOTORWAY "Kavkaz"6.00
highways of local value The Entrance to the town of Armaviru "0.90
nearest railway station Railway station «Armavir-1» Railway station «Аrmavir-2»4.50
nearest railway -0.08
airport Krasnodar airport200.00
seaport seaport Novorossiysk360.00
Additional information about the ground area
Special conditionsPlot prosadocnoj with thickness more than 5 m. Loam top 1-7 m, the horizon of the lower horizon of 3-13 m, podstilaemye shingle with sand filler. Seismicity of 7 points
Cost of rent/buy of the ground area, mln. rub0.60
Geographical coordinates of object (dd.dddddd)
Latitude (N)45.01816500
Longitude (E)41.09373700
NotesPlots are available at auction, the cost of rent is calculated at market value
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameAdministration of municipal formation Armavir town
Postal address352900, Krasnodar region, town of Armavir, UL. Karl Liebknecht, 52
Sitewww.armawir.ru
Phone/fax86137-2-74-70
E-mail addressinfo@armawir.ru
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipal formation Armavir town
Postal address352900, Krasnodar region, town of Armavir, UL. Karl Liebknecht, 52
Sitewww.armawir.ru
Phone/fax86137-2-74-70
E-mail addressinfo@armawir.ru
Executive (Full name, work position, phone number)Lavrentsova Elena

 

 

2006-2015

© Investment portal of Krasnodar region

Site map

Additions